I meant to blog about this earlier, but have been procrastinating and putting it off.
As some may know, the Anthony Henday is the outer ring road in Edmonton. It is a very convenient way to travel around Edmonton. The original design of it had tons of lights and stops (which was retarded), but after last year, overpasses had been constructed and most of the lights and stops had been taken away. Now the Henday is usually pretty free flowing.
Last year exactly this same time of year, my exit off the Henday was completed. I posted my bitching of how retarded it was. This year, I have to bitch about repaving it.
The road is brand new - one year old and for the last two to three months, my turn off had been suffering significant slow downs and line ups because there is repaving going on. Can we say WTF?! I can't imagine repaving is required after 1 year. Maybe I'm just dumb, and don't know the exact details of the road construction and maintenance schedule. Let's just hope they'll get it done right this time. I expect a 25 year service life on this.
The signs say the work will be done by mid October. So for two more weeks, I will have to endure more line ups and more slow downs. Sigh. Oh well, at least I get to practice my stop and go in my standard. Positive thinking.
Monday, October 1, 2012
Henday Bitchin'
Blogged by Crazie Jones at 12:51 PM
Labels: Crazie life, driving, Edmonton
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment